- Winning USD 252 million container terminal at Djendjen port PJ in Algeria.
- The construction will start at March 2012, and will take 30 months.
- PJ is to build the terminal, which can hold maximum of 14,000 TEU(1TEU = 1 container(20ft)) container ship.
- Daewoo E&C said many PJs are awaiting for the result, and the new order will be achieved well over the estimation of USD 5.3 billion.
|